Week 12 Development

First Week Back!

Published:  at  11:41 AM

Introduction

This week was our first week back from the break! Therefore, we did some re-organising and planned out the time schedule for the weeks to follow, in order to ensure that we will submit the project on time. We also began the work on the CAD of the ship, confirmed the specific location for our initial base via discussions, and sketched out an initial design for the homepage of our website.


Reorganisation

First, we made a Gantt Chart, in order to ensure everyone in the team knew what was happening at what time, and to ensure that we can submit the work on time. This is shown in Figure 1.

Gantt Chart
Figure 1: Gantt Chart

The Gantt Chart also provided us with a way to reflect on our progress at the end of a session, which can be used effectively to enable more reflection and make the chart more dynamic.


Location Discussions

Location

As our final location for our base, we chose Utopia Basin, as shown in Figure 2. Specifically, we will locate our base on the East Side, close to and North of Elysium Mons.

Map of Mars with Major Locations Labelled
Figure 2: Map of Mars with Major Locations Labelled (Planetary Society n.d.)

Reasons

This was for two main reasons:

  • Low Dust Storm Frequency (Figure 3)
  • Close Proximity to Potential Water Ice (Figure 4)

Although there were other reasons to consider, for us, dust storms was the major issue.

Dust Storm Frequency Map
Figure 3: Dust Storm Frequency Map. Red Area is Hellas Basin, Green Area is Utopia Basin. (Batallo & Wang 2018)
Mars Water Ice Map
Figure 4: Mars Water Ice Map. Gray Area is Utopia Basin, Red is Hellas Basin. (Heldmann et. al 2006)

However, also shown in Figure 4, the immediate location of our base will most likely not have water ice. Therefore, we will setup our base around the longitude of Elysium Mons, but we will send missions North to collect water ice. We did not choose a location that is higher, due to the much higher frequency of dust storms, which are a much bigger concern then the level of water ice.

Alternatives

The main other alternative was Hellas Basin, a large deep basin. Although it had slightly higher gravity and slightly lower solar radiation, its large dust storm frequency, as shown in Figure 3, ruled it out as our initial location.

Other Considerations

Other considerations that were taken into account can be seen in the footnotes.


Website Design Progress

Svelte

During the break, the components made in React was moved to Svelte. This was because of three main reasons:

  • Svelte code is shorter and more comprehensive
  • Svelte compiles to HTML and JS instead of using the Virtual DOM, making it faster
  • Rewriting everything to Svelte helped Isaac gain valuable information on making future features

See the Search Bar Component Before and After.

Mermaid

Furthermore, support for mermaid graphs was implemented, allowing easy integration of diagrams and graphs. Figure 5 shows an example graph, made with mermaid.

Sketch for Homepage Layout

This week, Will & Christy sketched out the design for the main homepage of the website. This is shown in Figure 6.

Rough Sketch of Homepage Layout
Figure 6: Rough Sketch of Homepage Layout

CAD Ship Design

Finally, Will started the CAD Ship Design, in Fusion 360. He will work through Week 13, and aim to have a workable initial version by Week 14.


Footnotes

Other Considerations

The three main other considerations were temperature, pressure and solar radiation exposure. Pressure was found to be correlated to height, with the low areas of Hellas having slightly higher pressure, but the difference is not noticeable. Temperature maps were found, but specific locations could not be read, and as shown in Extras 1 below, the solar radiation exposure of Hellas and Utopia are very similar.

Radiation Map of Mars
Extras 1: Radiation Map of Mars. Dark Blue Spot on left is Hellas Basin, Above and to the Right is Utopia Basin. (Jet Propulsion Laboratory 2002)